5 CSR 25-300.090 Physical Plant, Space, Supplies and Equipment 1 (F) states: Walls, ceilings, floors and equipment shall be finished with materials that can be cleaned easily and shall be free of splinters, cracks and chipped paint. Floor covering shall be in good condition. The facility shall be free of all lead hazards and asbestos that is friable or dangerous.
The ceilings located in hallway near exit to playground was/were not in good condition as evidenced by holes in tiles.