Home › NJ › Egg Harbor Township › Atlantic Christian School
Atlantic Christian School
391 Zion Road, Egg Harbor Township NJ 08234 · License #170900166 · Child Care Center
Contact
- Director
- Teresa Bird
- Phone
- (609) 653-1199
- Website
- www.acseht.org
- Address
- 391 Zion Road, Egg Harbor Township NJ 08234 · Directions
Hours
Care & schedule
When they operate
Schedule type not published.
Ages served
Ages not published.
- Accepts child care subsidy (CCDF)
How this facility compares
Violations per inspection, 3-yrInspection history & violations
Source: New Jersey DCF, Office of Licensing- Violation
3A:52-5.3(n)(4) · Fire prevention requirements are as follows: all fire extinguishers shall be visually inspected once a month, and serviced and tagged at least once a year and recharged, if necessary, as specified in the NJUFC.
Ensure that the fire extinguisher in room 4A is serviced as required.
Corrected by May 2, 2025
- Violation
3A:52-5.3(b)(7) · Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11.
Remove non-compliant slide from the outdoor play area.
Corrected by May 2, 2025
- Violation
3A:52-5.3(a)(5) · garbage receptacles shall be: made of durable, leak-proof and nonabsorbent materials; covered in a secure manner; emptied to the outdoor garbage receptacle when filled; maintained in a sanitary manner.
Ensure garbage receptacles are covered in a secure manner.
Corrected by May 2, 2025
- Violation
3A:52-5.3(a)(17) · 17. All televisions and computers shall be secured on a stable surface and shelving shall be secured and not be overloaded. 18. Ensure that microwave ovens, toaster ovens, and other portable devices used to heat or prepare food are out of children's reach, secured on a stable surface, and not in use when children are in the area in order to ensure the safety of children.
Ensure shelving is secure and not overloaded in bathrooms.
Corrected by May 2, 2025
- Violation
3A:52-5.3(a)(16) · Walls shall be painted or otherwise covered whenever there is evidence of: i. Excessive peeling or chipped paint; or ii. Heavily soiled conditions.
Repair and/or paint wall in the bathroom in room 4B.
Corrected by May 2, 2025
- Violation
3A:52-4.6(c)(3) · For early childhood programs, the following shall apply: the group teacher shall meet the requirements for experience and education
Provide documentation of qualification requirements as specified in the manual for 2 group teachers.
Corrected by May 2, 2025
- Violation
3A:52-4.11(b) · When the center applies for a new license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall ensure that each staff member at least 18 years of age who is or will be working at the center on a regularly scheduled basis completes the CHRI fingerprinting process specified in N.J.A.C. 3A:52-4.11(a). Within two weeks after a new staff member begins working at the center, the sponsor or sponsor representative shall ensure that the new staff member completes the CHRI fingerprinting process specified in N.J.A.C. 3A:52-4.11(a). Until the center receives the results of the CHRI background check for a new staff member, the center shall ensure oversight of that person by another staff member and ensure that the person is not alone to supervise a child or group of children.
Ensure that CHRI background checks are completed as required for 2 staff members.
Corrected by May 2, 2025
- Violation
3A:52-5.3(b)(7) · Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11.
Provide documentation indicating that the climber/slide truck is compliant with Playground Safety Subcode.
Corrected by May 28, 2025
- Violation
3A:52-5.3(m)(2) · Supplemental evacuation requirements are as follows: cribs, beds, playpens, and cots used for rest or sleep shall be arranged so as to provide access to a three-foot-wide aisle that leads to an unobstructed exit.
Ensure that all cribs, cots and sleeping equipment are arranged to provide access to a three foot wide aisle that leads to an exit.
Corrected by Jan 30, 2023
- Violation
3A:52-5.6(a) · At least five foot-candles of natural or artificial light shall be provided in all rooms used by children during naptime. The illumination shall be measured three feet above the floor at the farthest point from the light source.
Provide an adequate amount of light in the classroom during naptime.
Corrected by Jan 30, 2023
- Violation
3A:52-4.6(a) · The center shall maintain on file a Staff Records Checklist designated by the Office of Licensing, as specified in N.J.A.C. 3A:52-4.1(b), indicating that the center has obtained documentation of the applicable staff education and experience, as specified in 3A:52-4.6(b) through (d).
Complete and maintain on file a current Staff Records Checklist.
Corrected by Jan 30, 2023
- Violation
3A:52-4.8(g)(3) · The center shall maintain on file documentation of the date, time, topic, presenter, and attendance for all staff development and orientation completed by center staff members. The center shall record each staff member’s completion of staff development and orientation on the Staff Records Checklist, as specified in N.J.A.C. 3A:52-4.1(b).
Ensure that all staff complete annual orientation training within two weeks of hire and within the preceding 12 months. Document completion date on the Staff Records Checklist.
Corrected by Sep 19, 2023
- Violation
3A:52-4.10(a)(1) · The sponsor or sponsor representative, and each staff member shall complete a signed consent form provided by the Department that indicates the identifying information necessary to conduct a CARI background check, including the person’s name, address, date of birth, sex, race, and Social Security number. Pursuant to the Federal Privacy Act of 1974 (P.L. 93-579), the Department shall advise each such person that the disclosure of his or her Social Security number is voluntary, and that the Social Security number will only be used for the purpose of conducting a CARI background check.
Ensure that CARI background checks are completed as required for 2 staff members. On 3/29/2023, 1 outstanding.
Corrected by Sep 19, 2023
- Violation
3A:52-7.3(a)(2) · For early childhood programs, the following shall apply: for each child not enrolled in a public or private school, upon admission, the center shall maintain on file at the center a Universal Child Health Record (Department of Health Form CH-14) or its equivalent, updated annually, along with an immunization record, and a special care plan, if applicable. A 30-day grace period is permitted in N.J.A.C. 8:57-4.5(e)
Ensure that a Universal Health Record is completed upon enrollment and updated annually, including the immunization records and special care plans as required.
Corrected by Jan 12, 2024
- Violation
3A:52-4.11(a)(1) · As a condition of securing a license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall ensure that a Criminal History Record Information (CHRI) fingerprint background check is completed for himself or herself, and for all staff members at least 18 years of age who are or will be working at the center on a regularly- scheduled basis, to determine whether any such person has been convicted of a crime, as specified in P.L. 2000, c. 77 (N.J.S.A. 30:5B-6.10 to 6.17). The sponsor or sponsor representative and each staff member shall complete the electronic fingerprinting process through the vendor authorized by the State to conduct CHRI background checks through the Division of State Police in the Department of Law and Public Safety and the Federal Bureau of Investigation.
Ensure that a CHRI background check is completed as required for 5 staff members.
Corrected by Sep 19, 2023
- Violation
3A:52-5.2(a) · A person seeking a license or a Certificate of Life/Safety Approval to operate a center shall comply with all applicable provisions of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23 (hereinafter referred to as the “NJUCC”).
Submit a copy of the final Certificate of Occupancy or Certificate of Continued Occupancy that indicates the correct use group of I-4.
Corrected by Jul 11, 2024
- Violation
3A:52-5.2(a)(5) · The center shall be permitted to obtain a valid fire safety inspection certificate issued by the municipality in which it is located, based on a fire inspection conducted within the preceding 12 months, and submit a copy of the certificate to the Office of Licensing in lieu of a CO or CCO, if the center serves only children 2 ½ years of age or older and is located in a public school building that is used as a public school.
Ensure that fire extinguishers are easily accessible.
Corrected by Oct 20, 2023
- Violation
3A:52-5.3(a)(16) · Indoor maintenance and sanitation requirements are as follows: walls shall be painted or otherwise covered whenever there is evidence of
Repair and/or paint the walls and other surfaces, including unfinished doors, throughout the center.
Corrected by Oct 20, 2023
- Violation
3A:52-5.3(a)(2) · Indoor maintenance and sanitation requirements are as follows: floors, carpeting, walls, window coverings, ceilings, and other surfaces shall be kept clean and in good repair.
Clean the microwave in room 4A.
Corrected by Oct 20, 2023
- Violation
3A:52-5.3(b)(1) · Outdoor maintenance and sanitation requirements are as follows: the building, land, walkways, and outdoor play area shall be free from hazards to the health, safety or well-being of the children.
Secure exposed landscape fabric.
Corrected by Oct 20, 2023
- Violation
3A:52-5.3(b)(7) · Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11.
Provide and maintain the resilient surfacing and use zones under all play equipment as required in the EEC outdoor play area.
Corrected by Dec 12, 2023
- Violation
3A:52-5.3(b)(7)(i) · Outdoor maintenance and sanitation requirements are as follows: the center shall comply with the Playground Safety Subcode of the New Jersey Uniform Construction Code, as specified in N.J.A.C. 5:23-11. centers that take children to a community playground shall ensure that the playground surfacing and all other elements comply with the Playground Safety Subcode before being used by the children.
Replace missing hardware to secure the guardrail on the playground equipment in the SA outdoor play area.
Corrected by Oct 20, 2023
- Violation
3A:52-5.3(p) · Play equipment, materials, and furniture for indoor and outdoor use shall be of sturdy and safe construction, non-toxic, free of hazards, and used in accordance with the manufacturer’s instructions. The center may not use play equipment intended for outdoor use indoors.
Remove or repair spaceship in the SA outdoor play area.
Corrected by Oct 20, 2023
- Violation
3A:52-4.10(b)(1) · When the center applies for a new or renewal license or Certificate of Life/Safety Approval, the sponsor or sponsor representative shall submit to the Department the completed CARI consent forms for all staff members who are or will be working at the center on a regularly scheduled basis. Within two weeks after a new staff member begins working at the center, the sponsor or sponsor representative shall submit to the Department a completed CARI consent form for the new staff member.
Submit a CARI background check for the center's license renewal for 1 staff member.
Corrected by May 15, 2024
- Violation
3A:52-5.3(a)(19) · Indoor maintenance and sanitation requirements are as follows: the center shall test for the presence of radon gas in each classroom on the lowest floor level used by children at least once every five years and shall post the test results in a prominent location in all buildings at the center, as specified in N.J.S.A. 30:5B-5.2.
Complete radon testing in every room in modular buildings 1-6 and post the results in a prominent location.
Corrected by Sep 7, 2022
- Violation
3A:52-5.3(i)(1) · Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the applicant or facility operator shall submit a written certification to the Office of Licensing indicating whether the building has ever housed a use that was classified under the Uniform Construction Code, N.J.A.C. 5:23, as
Submit a letter of prior use from the municipality pertaining to modular buildings 1-6.
Corrected by Oct 6, 2022
- Violation
3A:52-5.3(i)(5)(i) · Environmental condition precautions are as follows: at the time of the initial application, any renewal application, relocation of an existing licensed center and, in the discretion of the Office of Licensing, any other time, the applicant or facility operator shall certify in writing that the center provides a potable water supply provided by a public community water system. If the facility is supplied by a public community water system, the applicant or facility operator shall provide documentation of water testing conducted by a laboratory certified by the Department of Environmental Protection for water testing for lead and copper from all faucets and other sources used for drinking water or food preparation and at least 50 percent of all indoor water faucets utilized by the center.
Complete and submit a DCF Drinking Water Testing Checklist and Statement of Assurance and a copy of the center's water testing completed by a laboratory certified by the Department of Environmental Protection pertaining to modular buildings 1-6.
Corrected by Oct 6, 2022
Questions to ask on your tour
Generated from this facility's specific inspection record
- 1The Mar 12, 2025 inspection noted: “Ensure that the fire extinguisher in room 4A is serviced as required.” — what has changed since then?
- 2The Dec 20, 2022 inspection noted: “Ensure that all cribs, cots and sleeping equipment are arranged to provide access to a three foot wide aisle that leads to an exit.” — what has changed since then?
- 3The Sep 1, 2022 inspection noted: “Complete radon testing in every room in modular buildings 1-6 and post the results in a prominent location.” — what has changed since then?
Data synced from New Jersey DCF, Office of Licensing · Source records · Report an error