Loading
Loading facility…
Pulling inspections, violations, and complaints.
Loading
Pulling inspections, violations, and complaints.
Home › MI › St Ignace › St Ignace Head Start
368 Reagon St, St Ignace MI 49781 · License #DC490261154 · Center · Center
Not published by the state. Owners can add hours via profile claim.
When they operate
Ages served
R 400.8520(14) · R 400.8520(14) Interior finishes. Combustible materials and decorations may be displayed on walls, not to exceed 20% of each wall in each room. Combustible materials and decorations suspended from or near the ceiling are prohibited. Bureau
Open Not marked corrected in the state record
Category: ratio. Open / not marked corrected.
R 400.8525(6) · R 400.8525(6) Exits. Means of egress shall be maintained in an unobstructed, easily traveled condition at all times that the center is in operation. Means of egress shall not be exposed to inherent hazards of the building, including the heating plant, flammable storage, commercial kitchen, or other similar conditions.
Empty boxes and a large table covered with books were in the egress hallway.
Open Not marked corrected in the state record
Category: ratio. Open / not marked corrected.
R 400.8170(13) · R 400.8170(13) Outdoor play area. All pieces of playground equipment that have an elevated playing or climbing surface, regardless of the height of the playing or climbing surface, must be surrounded by a shock absorbing surface and meet the guidelines defined by the Consumer Product Safety Commission (CPSC) Handbook for Public Playground Safety, which is available at no cost at www.cpsc.gov. This handbook is also available for inspection, and distribution at no cost, at the Michigan Department of Licensing and Regulatory Affairs, Bureau of Community and Health 2 LANDMARK BUILDING • 105 W. ALLEGAN STREET • LANSING, MICHIGAN 48933 Michigan.gov/MiLEAP Systems, Child Care Division, 611 West Ottawa Street, Lansing, MI 48933. The shock absorbing surface material may be either unitary or the loose-fill type. An exception to this subrule is provided for natural playgrounds.
Generated from this facility's specific inspection record
Data synced from Michigan MiLEAP, Child Care Licensing Bureau on Jul 9, 2026 · Source records · Report an error
CONCLUSION: REQUIREMENT NOT MET CORRECTIVE ACTION Engineered wood fiber will be delivered from Brink in Grand Rapids to PLAN: the Sault for all sites on 6/17. Contractor will bring mulch to ST. Ignace and spread by 6/23. DATE COMPLIANCE ASAP WILL BE ACHIEVED BY: Technical Assistance Technical assistance is support and training given to the licensee/licensee designee on a specific rule. Technical assistance includes consultation on how the facility can best maintain compliance with a rule.
Open Not marked corrected in the state record
Category: health medication. Open / not marked corrected.
R 400.8185(4) · R 400.8185(4) Primary care. Information regarding a child's food, health, and temperament must be shared daily between primary caregivers when more than 1 primary caregiver is assigned to any infant or toddler. Technical Assistance Technical assistance is support and training given to the licensee/licensee designee on a specific rule. Technical assistance includes consultation on how the facility can best maintain compliance with a rule.
Open Not marked corrected in the state record
Category: health medication. Open / not marked corrected.