Home › MI › Flint › Flint Cultural Center Academy
Flint Cultural Center Academy
1200 Robert T Longway Boulevard, Flint MI 48503 · License #DC250416465 · Center
Contact
- Phone
- (810) 339-8750
- Website
- Add via profile claim
- Address
- 1200 Robert T Longway Boulevard, Flint MI 48503 · Directions
Hours
Care & schedule
When they operate
Ages served
- Licensed for 331 children
How this facility compares
Violations per inspection, 3-yrInspection history & violations
Source: Michigan MiLEAP, Child Care Licensing Bureau- Violation
Licensee/PD will ensure all handwashing signs/guidelines are posted.
- Violation
Licensee/PD will ensure all individuals listed on CCBC have signed consent and disclosure onsite for review.
- Violation
R 400.8125(5)(b) · R 400.8125(5)(b) Staff; volunteer; requirements. The individual has been informed of the center's policies on child abuse and neglect.
PD will ensure all staff and volunteers have a signed statement regarding child abuse and neglect.
- Violation
R 400.8134(3)(a) · R 400.8134(3)(a) Hand washing. B efore meals, snacks, or food preparation experiences.
CONCLUSION: REQUIREMENT NOT MET CORRECTIVE ACTION PLAN: P D will ensure all children wash hands before eating. DATE COMPLIANCE WILL BE ACHIEVED BY: Rule/Statutory Violations
- Violation
Licensee/PD will ensure the CCBC is accurately maintained with connections, disconnections, and withdrawing.
- Violation
Licensee/PD will ensure all staff have negative TB test on file.
- Violation
R 400.8161(5) · R 400.8161(5) Emergency procedures. A fire drill program, consisting of at least 1 fire drill quarterly, must be established and implemented.
Licensee/PD will ensure quarterly fire drills are done in a calendar year.
- Violation
PD will ensure two tornado drills are completed between March and November for a calendar year.
- Violation
PD will ensure all cleaning supplies are locked up and inaccessible to kids.
- Violation
PD will ensure staff are trained twice a year on emergency procedures.
- Violation
CONCLUSION: REQUIREMENT NOT MET CORRECTIVE ACTION PD will ensure all staff have 16 hours of training annually. PLAN: DATE COMPLIANCE WILL BE ACHIEVED BY: Rule/Statutory Violations
- Violation
CONCLUSION: REQUIREMENT NOT MET CORRECTIVE ACTION PD will ensure all staff have an orientation before unsupervised PLAN: contact. DATE COMPLIANCE WILL BE ACHIEVED BY: Rule/Statutory Violations
- Violation
CONCLUSION: REQUIREMENT NOT MET CORRECTIVE ACTION PD will ensure all staff/volunteers have the required health and safety PLAN: trainings within 90 days of hiring. 7 LANDMARK BUILDING • 105 W. ALLEGAN STREET • LANSING, MICHIGAN 48933 Michigan.gov/MiLEAP DATE COMPLIANCE WILL BE ACHIEVED BY: Rule/Statutory Violations
- Violation
CONCLUSION: REQUIREMENT NOT MET CORRECTIVE ACTION PD will ensure all child information cards have the correct dates of PLAN: enrollment. DATE COMPLIANCE WILL BE ACHIEVED BY: Rule/Statutory Violations
- Violation
CONCLUSION: REQUIREMENT NOT MET CORRECTIVE ACTION PD will ensure all medication is labeled with dosage, instructions, PLAN: n ame, and strength of medication. DATE COMPLIANCE WILL BE ACHIEVED BY: Rule/Statutory Violations
- Violation
R 400.8182(3)(e) · R 400.8182(3)(e) Ratio and group size requirements. School-agres, child care staff member to child ratio of 1 to 18. maximum group size not applicable.
CONCLUSION: REQUIREMENT NOT MET CORRECTIVE ACTION PD will ensure there are no more than 36 students in a maximum group PLAN: a rea. DATE COMPLIANCE WILL BE ACHIEVED BY: Rule/Statutory Violations
- Violation
CONCLUSION: REQUIREMENT NOT MET CORRECTIVE ACTION PD will ensure there is no more than 36 students in a maximum group PLAN: area. DATE COMPLIANCE WILL BE ACHIEVED BY: Rule/Statutory Violations
- Violation
CONCLUSION: REQUIREMENT NOT MET CORRECTIVE ACTION PLAN: PD will ensure there is no more than 36 students in a maximum group area. DATE COMPLIANCE WILL BE ACHIEVED BY: Rule/Statutory Violations
- Violation
CONCLUSION: REQUIREMENT NOT MET CORRECTIVE ACTION PD will ensure all staff and volunteers have a signed statement PLAN: regarding child abuse and neglect. DATE COMPLIANCE WILL BE ACHIEVED BY: Rule/Statutory Violations
- Violation
CONCLUSION: REQUIREMENT NOT MET CORRECTIVE ACTION PLAN: PD will ensure all staff and volunteers have a signed statement regarding child abuse and neglect. 9 LANDMARK BUILDING • 105 W. ALLEGAN STREET • LANSING, MICHIGAN 48933 Michigan.gov/MiLEAP DATE COMPLIANCE WILL BE ACHIEVED BY: Rule/Statutory Violations
- Violation
R 400.8125(5)(a) · R 400.8125(5)(a) Staff; volunteer; requirements. The individual is aware that abuse and neglect of children is against the l aw.
CONCLUSION: REQUIREMENT NOT MET CORRECTIVE ACTION PD will ensure all staff and volunteers have a signed statement PLAN: regarding child abuse and neglect. DATE COMPLIANCE WILL BE ACHIEVED BY: Rule/Statutory Violations
- Violation
CONCLUSION: REQUIREMENT NOT MET CORRECTIVE ACTION PD will ensure all staff have an orientation before unsupervised PLAN: contact. DATE COMPLIANCE WILL BE ACHIEVED BY: Rule/Statutory Violations
- Violation
R 400.8161(7) · R 400.8161(7) Emergency procedures. A written log indicating the date and time of fire and tornado drills must b e kept on file at the center.
CONCLUSION: REQUIREMENT NOT MET CORRECTIVE ACTION PD will ensure two tornado drills between March and November of a PLAN: calendar year. DATE COMPLIANCE WILL BE ACHIEVED BY: Rule/Statutory Violations
- Violation
CONCLUSION: REQUIREMENT NOT MET CORRECTIVE ACTION Licensee will ensure all cleaning supplies are inaccessible to children. PLAN: DATE COMPLIANCE WILL BE ACHIEVED BY: Bureau
Questions to ask on your tour
Generated from this facility's specific inspection record
- 1The May 14, 2025 inspection noted: “Licensee/PD will ensure all handwashing signs/guidelines are posted.” — what has changed since then?
Data synced from Michigan MiLEAP, Child Care Licensing Bureau · Source records · Report an error