Loading
Loading facility…
Pulling inspections, violations, and complaints.
Loading
Pulling inspections, violations, and complaints.
Home › CT › Fairfield › Methodist Nursery School
1089 FAIRFIELD WOODS RD, Fairfield CT 06825 · License #DCCC.13108 · Center · Child Care Center
Not published by the state. Owners can add hours via profile claim.
When they operate
Schedule type not published.
Ages served
Ages not published.
[19a-79-7a(c)(2)] · For programs serving children younger than school age, the building, equipment and furnishings shall be maintained in a good state of repair. A maintenance program shall be established that ensures that the interior, exterior and grounds of the building are maintained, kept clean and orderly, free from accumulations of refuse, dampness, stagnant water, dilapidated structures and other health and safety hazards.
Corrected Corrected by Dec 4, 2025
Category: physical safety. Marked corrected in the state record.
[19a-79-7a(h)(1-9)] · There shall be access to a minimum of seventy-five (75) square feet per child of outdoor space for the number of children using the space at any one time. The outdoor area shall be fenced or protected for safety. Outdoor play equipment shall have a shock absorbing surface, under and around, that shall effectively cushion the fall of a child, except where the child is sitting or standing at ground level. The shock absorbing surface shall be maintained at a depth of at least eight inches, be free of water and not allowed to become compacted. Acceptable shock absorbing surfaces may include mulch, sand, and wood chips. Synthetic material that is less than eight inches in depth, including but not limited to, rubber mats or tiles may be acceptable surfaces provided the operator maintains documentation on the licensed premises that the synthetic material is manufactured for this purpose, installed in accordance with the manufacturer’s specifications and sufficient to cushion the fall of a child. Concrete, asphalt, grass and dirt shall not be considered a shock absorbing surface. The playground shall be free of glass, debris, holes and other hazards. Nuts, bolts and screws shall be tight; and those that protrude shall be covered or protected. Outside equipment shall be anchored for stability when recommended by the manufacturer. Anchors shall be buried below ground level. The operator shall provide documentation to the Office, upon request, by a certified playground safety inspector that newly constructed playgrounds and all newly installed playground equipment that are set in position and anchored in such a way to last indefinitely are designed and installed in accordance with U.S. Consumer Product Safety Commission and the American Society for Testing and Materials Standards. Drinking water shall be available and accessible to children. Outdoor equipment shall be arranged in such a way as to avoid accidents. All play equipment, fences, and structures shall not pose a hazard.
Data synced from Connecticut Office of Early Childhood on Jul 10, 2026 · Source records · Report an error
Corrected Corrected by Dec 4, 2025
Category: physical safety. Marked corrected in the state record.
[19a-79-5a(a)(3)(A)] · A written report shall be produced and maintained on the licensed premises, and for a period of not less than 2 years, documenting any injuries or accidents that result in an injury to a child, or illness of a child enrolled at the facility, an incident that is required to be reported to DCF. This report shall be available to the OEC upon request and a copy shall be provided to the parent no later than the next business day.
Corrected Corrected by Dec 18, 2024
Category: health medication. Marked corrected in the state record.
[19a-79-3a(d)(1)] · The operator shall implement and annually review specific written policies, plans and procedures that include daily attendance records for both children and staff showing the specific times of arrival and departure. The operator shall notify the parent(s), staff and the Office of Early Childhood within five (5) days of changes in these policies, plans and procedures.
Corrected Corrected by Dec 1, 2023
Category: recordkeeping. Marked corrected in the state record.
[19a-79-4a(h)(2)(G)] · A written plan for consultation services shall be developed, signed annually by the consultant and implemented. Consultative services shall include documenting the activities and observations in a consultation log that is kept on file at the facility for two years.
Corrected Corrected by Dec 1, 2023
Category: other. Marked corrected in the state record.
[-] · -
Corrected Corrected by Jan 27, 2023
Category: other. Marked corrected in the state record.
[19a-79-7a(g)(4) and/or 19a-79-7a(h)] · Hardware such as air conditioners, water heaters or fuse boxes shall be inaccessible to children. The playground shall be free of glass, debris, holes and other hazards.
Corrected Corrected by Apr 4, 2022
Category: physical safety. Marked corrected in the state record.
[19a-79-7a(h)(5) &/or 19a-79-7a(h)(9)] · Outside equipment shall be anchored for stability. Anchors shall be buried below ground level. Outdoor equipment shall be arranged in such a way as to avoid accidents.
Corrected Corrected by Apr 4, 2022
Category: physical safety. Marked corrected in the state record.
[19a-79-7a] · The building, equipment and services (outdoors) shall be maintained in a good state of repair, free of chipping/peeling paint and lead paint hazards.
Corrected Corrected by Apr 4, 2022
Category: physical safety. Marked corrected in the state record.
[19a-79-4a(a)(3) and/or 19a-79-4a(g)] · A file shall be kept on the licensed premises for each employee of the child care center or group child care home which shall include documentation of professional development for each program staff person who cares for the children, including new employee orientation and annual training for current staff on programs policies, plans and procedures. Professional development for program staff shall be required for one (1) per cent of the total annual hours worked. The operator of the child care center or group child care home shall develop, implement and maintain a written plan for professional development in child care. The operator shall have documentation of a professional development plan for each program staff member which shall be maintained on site at the facility and made available for review.
Corrected Corrected by Apr 4, 2022
Category: recordkeeping. Marked corrected in the state record.