Loading
Loading facility…
Pulling inspections, violations, and complaints.
Loading
Pulling inspections, violations, and complaints.
Home › CO › Denver › Innovation Learning at Highline
19451 E. Maxwell Place, Denver CO 80249 · License #1785366 · Center · School-Age Child Care Center
Not published by the state. Owners can add hours via profile claim.
When they operate
Schedule type not published.
Ages served
Ages not published.
2.511.C.5.a · -g The individual health care plan must be updated at least every twelve (12) months from the date of the initial plan, and as changes occur. The plan must include all information needed to care for the child, must be signed by the health care provider and parent(s) or guardian(s), and must include, but not be limited to, the following: a. Medication and dosing schedule; b. Nutrition and feeding instructions; c. Medical equipment or adaptive devices, including instructions; d. Medical emergency instructions; e. Toileting and personal hygiene instructions; f. Behavioral interventions; and g. Medical procedure/ intervention.
Reviewed 1 child's health care plan and it was expired. Reviewed 1 child's health care plan and the facility was lacking medication that was listed. Correction: The individual health care plan must be updated at least every twelve (12) months from the date of the initial plan, and as changes occur. The plan must include all information needed to care for the child, must be signed by the health care provider and parent(s) or guardian(s), and must include, but not be limited to, the following: a. Medication and dosing schedule;
Open Not marked corrected in the state record
Category: health medication. Open / not marked corrected.
2.138.A · Emergency drills, lockdown and active shooter on premises drills must be held at least quarterly but often enough so that all occupants are familiar with the drill procedure and their conduct during a drill is a matter of established routine. Fire drills must be held monthly and be consistent with local fire department procedures. Tornado drills must be held monthly from March to October. A record of all emergency drills held over the past twelve (12) months must be maintained by the facility or center, including date and time of drill, number of adults and children participating, and the amount of time taken to evacuate.
Generated from this facility's specific inspection record
Data synced from Colorado Department of Early Childhood (CDEC) on Jul 9, 2026 · Source records · Report an error
Licesing Specialist reviewed the facility's emergency drill log and it was lacking Tornado drills as well as Lockdown and Active Shooter drills. Correction: Emergency drills, lockdown and active shooter on premises drills must be held at least quarterly but often enough so that all occupants are familiar with the drill procedure and their conduct during a drill is a matter of established routine. Fire drills must be held monthly and be consistent with local fire department procedures. Tornado drills must be held monthly from March to October. A record of all emergency drills held over the past twelve (12) months must be maintained by the facility or center, including date and time of drill, number of adults and children participating, and the amount of time taken to evacuate. Correct immediately and respond with verification of compliance by 5/28/2026. Correct by 05/21/2026
Corrected Corrected by May 21, 2026
Category: recordkeeping. Marked corrected in the state record.
2.522.C · Indoor and outdoor equipment, materials, and furnishings must be sturdy, safe and free of hazards. FAX 303-866-4453 Phone 303-866-5948 ________________________________________________
Outside on the playground there was weed matting material that was stick up out of the wood chips under the swings and at the bottom of a purple slide. The weed matting material can pose a possible tripping hazard. Correction: Indoor and outdoor equipment, materials, and furinings including weed matting must be sturdy, safe, and free of hazard. Correct and respond with verification of compliance by 8/21/2025. Correct by 08/21/2025
Corrected Corrected by Aug 21, 2025
Category: physical safety. Marked corrected in the state record.
2.122.C · All child care facilities must operate in compliance with local planning and zoning requirements of the municipality, city and county, or county where the facility is located.
At the time of the visit the facility was lacking a Denver Business License. Correction: All child care facilities must operate in compliance with local planning and zoing requirements including a Denver Business License. Correct and respnd with verification of compliance by 8/21/2025. Correct by 08/21/2025
Corrected Corrected by Aug 21, 2025
Marked corrected in the state record.